ITN
Holborn, London
£2.9million project value
Broadcast sector
Project Background
The ITN project was a multi-phase plan requiring key business teams to be rehoused within the building whilst works were underway. This necessitated 24-hour working in order to reduce project length and maintain ongoing broadcasting schedules by undertaking disruptive tasks during breaks in transmission.
Project Scope
- Build, fit out and mechanical and electrical works
- Construction of Mix Theatre Suites, Atmos studios, ADR rooms, complete floor of 25 Edit Suites
- Design of acoustically specialist spaces
- Installation of kitchen and WC facilities
- Structural works including pumped concrete floors to form ground floor opening for a staircase
“We’ve developed a great working relationship with Darryl Easton and his team and look forward to working with them again on future projects”